Station Plaza, Hastings
3 new residential buildings delivering 103 apartments as part of the Station Plaza regeneration project adjacent Hastings Train Station.
After our Client acquired this project - approved in 2007 with the design of HNW Architects – we were appointed to optimize the old approval, submit a material amendment, and produce the detailed design for this brownfield proposal. The layouts were revised to increase efficiency and sales value and bring them up to current building regulation standards. The elevations were rationalized and the detailing made more robust whilst staying true to the original design intent.
We have finished the Technical Desing and construction started in early 2024.
Status: Started on site in early 2024
Total GIA: 83,900sqft
Client: Nieucon Ltd
Main Contractor: Metsuki Ltd.
Project Coordinator and Cost Planning: Modus Construction Consultants
Planning Consultant: Boyer Planning
CDM: Ashby Design / Safety CDM
Building Control: Bureau Veritas
Structural Engineer: GD Structural
MEP: JPA M&E Consultants
Fire Engineers: Fire Safety Services
Acoustics: Acoustics Plus