3 new residential buildings delivering 103 apartments as part of the Station Plaza regeneration project adjacent Hastings Train Station.

After our Client acquired this project - approved in 2007 with the design of HNW Architects – we were appointed to optimize the old approval, submit a material amendment, and produce the detailed design for this brownfield proposal. The layouts were revised to increase efficiency and sales value and bring them up to current building regulation standards. The elevations were rationalized and the detailing made more robust whilst staying true to the original design intent.

We have finished the Technical Desing and construction started in early 2024.

Status: Started on site in early 2024

Total GIA: 83,900sqft

Client: Nieucon Ltd

Main Contractor: Metsuki Ltd.

Project Coordinator and Cost Planning: Modus Construction Consultants

Planning Consultant: Boyer Planning

CDM: Ashby Design / Safety CDM

Building Control: Bureau Veritas

Structural Engineer: GD Structural

MEP: JPA M&E Consultants

Fire Engineers: Fire Safety Services

Acoustics: Acoustics Plus